Фрагмент инструкции: руководство пользователя HAIER HSU-12C03-K-F-Подробные указания по применению содержатся в руководстве пользователя. Necessary Tools for Installation
1. Driver 2. Hacksaw 3. Hole core drill 4. Spanner(17,19 and 26mm) 5. Torque wrench(17mm,22mm,26mm) 6. Pipe cutter 7. Flaring tool 8. Knife 9. Nipper 10. Gas leakage detector or soap-and-water solution 11. Measuring tape 12. Reamer
Drawing for the installation of indoor and outdoor units
Accessory parts
No. 1 2 3
Mounting plate
more than 5cm
Accessory parts
Remote controller
Number of articles
1 2 1 1 6 4 1 4 1 1
Optional parts for piping Mark
A B C D E F G Parts name Non-adhesive tape Adhesive tape Saddle(L. S) with screws Connecting electric cable for indoor and outdoor Drain hose Heating insulating material Piping hole cover
mo
re t
han
10c m
R-03 dry battery
mo
re t
han
10c m
4 5 6 7 8 9
10
Drain hose 4X50 Steel nail, cement 4X25 Screw Plastic cap Cover Cushion
Attention must be paid to the rising up of drain hose
A
C
Arrangement of piping directions
mo re t
Rear left Left Rear right Below Right
ha n1
0c m
re t mo
han
10c
m
Pipe supporting plate
Drain-elbow
D E
more
than
60cm
mor
e th
an 1 5cm
The marks from A to G in the figure are the parts numbers. The distance between the indoor unit and the floor should be more than 2m. 0010531057
Floor fixing dimensions of the outdoor unit (Unit:mm)
HSU-09H03/K(F) HSU-12H03/K(F) HSU-12C03/K(F)
Selection of pipe
To this unit, both liquid and gas pipes shall be insulated as they become Iow temperature in operation. Use optional parts for piping set or pipes covered with equivalent insulation material. Liquid pipe ( Gas pipe ( )
For 09k
) 6. 35mm(1/4") 9. 52mm(3/8")
For 12k
6. 35mm(1/4") 12. 7mm(1/2")
Indoor unit 1... |
Copyright © 2005 - 2012 - Diplodocs -
Все права защищены. Торговые марки принадлежат их соответствующим владельцам. |